yes. As long as the application is not abandoned, the patent type can be converted from invention to utility model within 3 months of filing the invention patent application, or within 3 months from the date when IMPI requires the applicant to make the conversion, after paying the relevant fees.
Novelty grace period of 12 months for inventors, their successors and third parties who have received information about the invention from the inventor/successors, through any form of communication or at national and international exhibitions .
20 years
As a PCT filing office, it accepts the restoration of the right of priority on the grounds of "unintentional".
yes. As long as the application is not abandoned, the patent type can be converted from utility model to invention within 3 months of filing the utility model patent application, or within 3 months from the date when IMPI requires the applicant to make the conversion, after paying the relevant fees.
yes. As long as the application is not abandoned, the patent type can be converted from invention to utility model within 3 months of filing the invention patent application, or within 3 months from the date when IMPI requires the applicant to make the conversion, after paying the relevant fees.
- Grant fee: The applicant should pay the granted registration fee within 2 months after receiving the granted decision notice, and pay the annual fee for the first to third years at the same time.
- Annuity: Subsequent payment of annual fee every 5 years, overdue payment can be made within the grace period after 6 months, but a penalty must be paid at the same time.
1-2 years
Filing Language: Spanish
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Sequence Listing (PDF format and TXT format)
- Scanned Copy of Certified Priority Document / DAS
- Power of Attorney
- small entity declaration
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entry into the Mexican national phase 19/28/34/41 Amendments
- Power of Attorney
- small entity declaration
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
Mexican Institute of Industrial Property
English: Mexican Institute of Industrial Property, abbreviation: IMPI
URL: www.impi.gob.mx
Mexican Invention Patent Search: Search -- FOLLOW (impi.gob.mx)
Filing Language: Spanish
Necessary documents:
- Exterior Design Picture (Six Views)
- A Brief Description
Attachments (if any):
- Certified Priority Document
- Power of Attorney
- Certified Priority Document
- small entity declaration
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer