no
yes. For an invention with the same subject matter, the applicant may file a patent type conversion request within 2 months from the date of receiving the patent application decision, but no later than 10 years from the application date, and change the patent type from invention to utility model .
no
The BPO conducts formal and substantive examinations of invention patent applications. The BPO will complete the formality examination within 1 month from the filing date, and then the BPO will verify the Certified Priority Document and its related fees, and will conduct a preliminary substantive examination and unity examination of the patent application within 3 months after the end of the preliminary examination. A patent application that has paid the search fee and publication fee is published within 18 months from the filing date/priority date, and the opposition period is 3 months from the publication date. Search reports, written opinions on patentability and third-party opinions will be conveyed to the applicant no later than 6 months after the expiration of the 3-month opposition period. Can be authorized.
yes. Designs in the same category, or belonging to the same set or combination of articles, may contain several designs in one design (this condition does not apply when the product containing or attached to the design is an ornament).
Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.
1 month
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 31 months from earliest priority date.
no
- Grant fee: It must be paid together with the granted announcement fee within one month from the receipt of the granted notice.
- Annuity: pay year by year from the first year of the application date, and should be paid before the last day of the month of the application date at the latest, not exceeding one patent year, and the annual fee can be paid within a grace period of 6 months if it is overdue, and paid at the same time 200% late fee.
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 31 months from earliest priority date.
- Validation of European Patent in EPO member states: 3 months from the date of European patent grant