no
Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.
- Authorization Fee: None
- Annuity: After granted, it will be paid year by year from the 4th year from the date of application, and should be paid within 3 months before the date of application each year. If the annual fee is overdue, the payment can be postponed within a grace period of 6 months, but a surcharge of 20% is required. The first annual fee (i.e. the 4th year) can be paid within 6 months of the late payment period without paying the penalty. It can also be paid every three years in the 4th to 6th year, and in the 7th to 10th year.
ATPO conducts formality examination only for utility model patent applications. Although ATPO searches utility model patent applications, the search results do not affect the grant results. The applicant may amend the patent application after receiving the search report.
A novelty grace period of 6 months prior to the filing date/priority date may be granted if the invention is disclosed as a result of apparent misuse by the applicant or its former right holders, or if the invention is exhibited at an official or officially recognized exhibition.
ATPO only conducts formality examination of design patent applications.
Filing Language: German
via Paris Convention via Nationalization of PCT Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Necessary documents:
- Abstract
- Abstract Drawing
- Claim
- Specification
- Drawing
Attachments (if any)
- Power of Attorney
- Certified Priority Document
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- Notification issued by CNIPA notify the applicant the application has passed through the security review
Attachments (if any)
- WIPO Publication
- ISR/IPRP
- Entry into the German national phase 19/28/34/41 amended
- Power of Attorney
- Declaration of Ownership/Certification of Employment/Assignment of priority
- Assignment for Patent Right Transfer
- via Paris Convention : 12 months from earliest priority date.
- via Nationalization of PCT : 30 months from the earliest priority date.
- Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.
11 months. If an expedited request is made, granted can be obtained in about 3-4 months.
yes. If multiple designs have at least one of the same category, a maximum of 50 designs can be included in one design.
yes. Prior to patent grant/rejection, the patent type can be converted from utility model to invention at the request of the applicant. Can only be converted once.