Filing Language: German | |
| via Paris Convention | via Nationalization of PCT |
Necessary documents:
| Necessary documents:
|
Attachments (if any)
| Attachments (if any)
|
via Paris Convention : 12 months from earliest priority date.
via Nationalization of PCT : 30 months from the earliest priority date.
Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.
The initial protection is 5 years, which can be renewed 4 times for a maximum protection of 25 years.
yes
If within 12 months before the filing of the design patent application, due to the disclosure of the designer or its former right holder, the novelty grace period can be enjoyed.
- Authorization Fee: None
- Annuity: After granted, it will be paid year by year from the 4th year from the date of application, and should be paid within 3 months before the date of application each year. If the annual fee is overdue, the payment can be postponed within a grace period of 6 months, but a surcharge of 20% is required. The first annual fee (i.e. the 4th year) can be paid within 6 months of the late payment period without paying the penalty. It can also be paid every three years in the 4th to 6th year, and in the 7th to 10th year.
- via Paris Convention : 6 months from earliest priority date.
- EU route: 6 months from earliest priority date.
- Hague Agreement route: 6 months from earliest priority date.
yes
Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.
yes. Prior to patent grant/rejection, the patent type can be converted from utility model to invention at the request of the applicant. Can only be converted once.
Austrian Patent Office
English: Austrian Patent Office, abbreviation: ATPO
Website: Home | Das Österreichische Patentamt
Austrian Utility Model Patent Search: National Patents Search (patentamt.at)