Is a utility model application in Austria eligible for DAS?

Submitted by 页之码 on

yes

专利申请流程

  • Filing Language: German

    via Paris Convention via Nationalization of PCT

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Attachments (if any)

    1. Sequence Listing (PDF format and TXT format)
    2. Certificate of Deposit of Microorganisms and its German Translation
    3. Certificate of Microbiological Survival and its German Translation
    4. Power of Attorney
    5. Scanned Copy of Certified Priority Document / DAS
    6. Declaration of Ownership/Certification of Employment/Assignment of priority
    7. Assignment for Patent Right Transfer
    8. Notification issued by CNIPA notify the applicant the application has passed through the security review

    Attachments (if any)

    1. WIPO Publication
    2. ISR/IPRP
    3. Entry into the Austrian national phase 19/28/34/41 amended
    4. Sequence Listing (PDF format and TXT format)
    5. Certificate of Deposit of Microorganisms and its German Translation
    6. Certificate of Microbiological Survival and its German Translation
    7. Declaration of Ownership/Certification of Employment/Assignment of priority
    8. Assignment for Patent Right Transfer
  • no

  • Filing Language: German

    via Paris Convention via Nationalization of PCT

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Attachments (if any)

    1. Power of Attorney
    2. Certified Priority Document
    3. Declaration of Ownership/Certification of Employment/Assignment of priority
    4. Assignment for Patent Right Transfer
    5. Notification issued by CNIPA notify the applicant the application has passed through the security review

    Attachments (if any)

    1. WIPO Publication
    2. ISR/IPRP
    3. Entry into the German national phase 19/28/34/41 amended
    4. Power of Attorney
    5. Declaration of Ownership/Certification of Employment/Assignment of priority
    6. Assignment for Patent Right Transfer
  • Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.

  • 11 months. If an expedited request is made, granted can be obtained in about 3-4 months.

  • Filing Language: German

    Necessary documents:

    1. Exterior Design Picture (Six Views)
    2. A Brief Description

    Attachments (if any):

    1. Power of Attorney
    2. Certified Priority Document
    3. Declaration of Ownership/Certification of Employment/Assignment of priority
    4. Assignment for Patent Right Transfer
  • yes. If multiple designs have at least one of the same category, a maximum of 50 designs can be included in one design.

    • Authorization Fee: None
    • Annuity: The annual fee is paid every 5 years. The overdue annual fee can be paid within a grace period of up to six months after the due date, and a 20% late fee will be paid at the same time. Pay within the first 3 months of the grace period with no late fees.
  • via Paris Convention : 12 months from earliest priority date.

    via Nationalization of PCT : 30 months from the earliest priority date.

    Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.

  • yes. Prior to patent grant/rejection, the patent type can be converted from utility model to invention at the request of the applicant. Can only be converted once.