Instructions for Authorization of Utility Model Application and Annual Fee in Austria

Submitted by 页之码 on
  • Authorization Fee: None
  • Annuity: After granted, it will be paid year by year from the 4th year from the date of application, and should be paid within 3 months before the date of application each year. If the annual fee is overdue, the payment can be postponed within a grace period of 6 months, but a surcharge of 20% is required. The first annual fee (i.e. the 4th year) can be paid within 6 months of the late payment period without paying the penalty. It can also be paid every three years in the 4th to 6th year, and in the 7th to 10th year.

专利申请流程

  • 11 months. If an expedited request is made, granted can be obtained in about 3-4 months.

  • A novelty grace period of 6 months prior to the filing date/priority date may be granted if the invention is disclosed as a result of apparent misuse by the applicant or its former right holders, or if the invention is exhibited at an official or officially recognized exhibition.

  • 20 years. Patented medicines and plant protection new varieties can obtain an additional 5-year renewal period, and children's medicines can obtain an additional half-year patent protection period.

  • no

  • yes. Before the patent is granted/rejected, the patent type can be changed from invention to utility model at the request of the applicant. Can only be converted once.

  • Filing Language: German

    via Paris Convention via Nationalization of PCT

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Attachments (if any)

    1. Sequence Listing (PDF format and TXT format)
    2. Certificate of Deposit of Microorganisms and its German Translation
    3. Certificate of Microbiological Survival and its German Translation
    4. Power of Attorney
    5. Scanned Copy of Certified Priority Document / DAS
    6. Declaration of Ownership/Certification of Employment/Assignment of priority
    7. Assignment for Patent Right Transfer
    8. Notification issued by CNIPA notify the applicant the application has passed through the security review

    Attachments (if any)

    1. WIPO Publication
    2. ISR/IPRP
    3. Entry into the Austrian national phase 19/28/34/41 amended
    4. Sequence Listing (PDF format and TXT format)
    5. Certificate of Deposit of Microorganisms and its German Translation
    6. Certificate of Microbiological Survival and its German Translation
    7. Declaration of Ownership/Certification of Employment/Assignment of priority
    8. Assignment for Patent Right Transfer
  • yes

  • Filing Language: German

    via Paris Convention via Nationalization of PCT

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Attachments (if any)

    1. Power of Attorney
    2. Certified Priority Document
    3. Declaration of Ownership/Certification of Employment/Assignment of priority
    4. Assignment for Patent Right Transfer
    5. Notification issued by CNIPA notify the applicant the application has passed through the security review

    Attachments (if any)

    1. WIPO Publication
    2. ISR/IPRP
    3. Entry into the German national phase 19/28/34/41 amended
    4. Power of Attorney
    5. Declaration of Ownership/Certification of Employment/Assignment of priority
    6. Assignment for Patent Right Transfer
  • Filing Language: German

    Necessary documents:

    1. Exterior Design Picture (Six Views)
    2. A Brief Description

    Attachments (if any):

    1. Power of Attorney
    2. Certified Priority Document
    3. Declaration of Ownership/Certification of Employment/Assignment of priority
    4. Assignment for Patent Right Transfer
  • 1 month