Is a utility model application in Austria eligible for DAS?

Submitted by 页之码 on

yes

专利申请流程

  • If within 12 months before the filing of the design patent application, due to the disclosure of the designer or its former right holder, the novelty grace period can be enjoyed.

    • via Paris Convention : 12 months from earliest priority date.
    • via Nationalization of PCT : 30 months from the earliest priority date.
    • Validation of European Patent in EPO member states: within 3 months from the date of grant of the European patent.
  • Filing Language: German

    via Paris Convention via Nationalization of PCT

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Attachments (if any)

    1. Sequence Listing (PDF format and TXT format)
    2. Certificate of Deposit of Microorganisms and its German Translation
    3. Certificate of Microbiological Survival and its German Translation
    4. Power of Attorney
    5. Scanned Copy of Certified Priority Document / DAS
    6. Declaration of Ownership/Certification of Employment/Assignment of priority
    7. Assignment for Patent Right Transfer
    8. Notification issued by CNIPA notify the applicant the application has passed through the security review

    Attachments (if any)

    1. WIPO Publication
    2. ISR/IPRP
    3. Entry into the Austrian national phase 19/28/34/41 amended
    4. Sequence Listing (PDF format and TXT format)
    5. Certificate of Deposit of Microorganisms and its German Translation
    6. Certificate of Microbiological Survival and its German Translation
    7. Declaration of Ownership/Certification of Employment/Assignment of priority
    8. Assignment for Patent Right Transfer
  • Filing Language: German

    via Paris Convention via Nationalization of PCT

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Necessary documents:

    1. Abstract
    2. Abstract Drawing
    3. Claim
    4. Specification
    5. Drawing

    Attachments (if any)

    1. Power of Attorney
    2. Certified Priority Document
    3. Declaration of Ownership/Certification of Employment/Assignment of priority
    4. Assignment for Patent Right Transfer
    5. Notification issued by CNIPA notify the applicant the application has passed through the security review

    Attachments (if any)

    1. WIPO Publication
    2. ISR/IPRP
    3. Entry into the German national phase 19/28/34/41 amended
    4. Power of Attorney
    5. Declaration of Ownership/Certification of Employment/Assignment of priority
    6. Assignment for Patent Right Transfer
  • 20 years. Patented medicines and plant protection new varieties can obtain an additional 5-year renewal period, and children's medicines can obtain an additional half-year patent protection period.

  • ATPO conducts formality examination only for utility model patent applications. Although ATPO searches utility model patent applications, the search results do not affect the grant results. The applicant may amend the patent application after receiving the search report.

    • via Paris Convention : 6 months from earliest priority date.
    • EU route: 6 months from earliest priority date.
    • Hague Agreement route: 6 months from earliest priority date.
  • Reinstatement of priority on grounds of "due care" and "unintentional/due care" accepted.

  • no

  • yes. Prior to patent grant/rejection, the patent type can be converted from utility model to invention at the request of the applicant. Can only be converted once.